Requirements
Depending on the nature and size of works, a dossier of application for construction permit comprises the following principal documents:
Legal documents (01 set):
1.
Application for construction permit (original)
(in accordance with Form 12 Circular 10/2012/TT-BXD)
2.
Investment Certificate (Simple copy)
3.
Land use right certificate (an authentic copy)
4.
Certificate of fire prevention and fighting appraisal and approval (an authentic copy)
(together with 01 copy set of drawings with approval seal affixed)
5.
Approval of EIA report (an authentic copy)
6.
Approval of construction-planning tasks (an authentic copy)
7.
Approval of construction-planning projects (an authentic copy)
or
Approval of master plan and architectural plan approval (an authentic copy)
8.
Planning certificate (an authentic copy)
9.
Planning license (an authentic copy)
10.
Written approval of construction of the investor (original)
(applied for interleaved construction with basement - if any)
11.
Statement of capability and experience of individual/organization responsible for the design (original)
(in accordance with Appendix 9 of Circular 10/2012/TT-BXD)
12.
Practising certificate (an authentic copy)
of the individual/chairman responsible for the designs
Design drawings (02 original sets):
1.
Master plan drawing of project or master plan of separate phases of project 1/100-1/500 scale (original)
2.
Drawings of construction items' plan, scale 1/100 - 1/500 (original)
together with construction location map
3.
Main vertical and sectional drawings of construction items,scale 1/50-1/200 (original)
4.
Drawings of base footing of construction items, scale 1/100 - 1/200 (original)
5.
Sectional drawings of footing of construction items, scale 1/50 (original)
6.
Diagrams of technical infrastructure works (original)
connections of rain drainage, wastewater drainage, water supply, power supply, communication, scale 1/50-1/200
Time frame
Waiting time in queue:
Max. 15mn
Attention at counter:
Min. 15mn - Max. 45mn
Legal justification
1.
Law No.16/2003/QH11 of the National Assembly on Construction
articles 62, 63, 64
2.
Circular No. 10/2013/TT-BXD of the Ministry of Construction dated July 25, 2013 on construction quality management
Article 14.3
3.
Circular No. 10/2012/TT-BXD of the Ministry of Construction dated December 20, 2012 guiding in detail some contents of Decree No. 64/2012/ND-CP dated September 04, 2012 of the government concerning issuance of Construction permit
Article 5
4.
Decree 64/2012/ND-CP of the Government dated September 04, 2012 on construction permit
articles 5, 8, 9
5.
Decision 27/2014/QD-UBND Hochiminh City dated 06 August 2014 detailed in some contents of construction licence
articles 1.3, 5.2
Additional information
Within the scope of e-Regulations HCMC system, we only present the procedure of construction permit applied to investment projects have 100% foreign capital.
For projects that use foreign and state capital, other than above requirements, the investors might have to provide more documents as below:
- Decision on approving the project together with the written approval of the investment of the competent State agencies, written comment on the basic design (if any) of the State management agency on specialized construction works as prescribed.
- Other relevant documents (if any)
The investors should contact Construction Permit Division of HCMC Construction Department for more guidance.