Requirements
1.
Written request for opinions on conceptual plans (original)
2.
Land lease contract (an authentic copy)
3.
Meeting minutes of on-site tittle plan verification (Simple copy)
or
Land use right certificate (an authentic copy)
4.
Practising certificate (an authentic copy)
of the individual/chairman responsible for the designs
5.
Written recommendation on the fire prevention and fighting solutions of the conceptual plans (an authentic copy)
Design drawings (2 sets):
1.
Explanation of conceptual plans (original)
(according to article 8 Decree No. 12/2009/ND-CP)
2.
Location map of land plot inside the industrial zone (original)
3.
Master plan drawing of construction project (original)
(clearly specify the locations of construction items, construction area, area of constructed floor plan, construction density, land-use coefficient...)
4.
Drawings of architectural plan (original)
(Planar, vertical and sectional drawings of construction items)
5.
Drawings of major construction structure plan (original)
(drawings of ground-footing reinforcement; details of footing; planar structure, major sectional structures; typical structure of construction items)
6.
Drawings of general planar infrastructure systems (original)
power supply; water supply and drainage; communications,...(clearly specify the connections from general power box, pump, wastewater processing unit,...to each construction item and to general infrastructure system of Industrial zone)
Time frame
Within 15 working days for projects of Group B; within 10 working days for projects of Group C.
Waiting time in queue:
Min. 5mn - Max. 15mn
Attention at counter:
Min. 15mn - Max. 20mn
Legal justification
1.
Law No.16/2003/QH11 of the National Assembly on Construction
articles 35, 37
2.
Decree 12/2009/ND-CP dated 12/02/2009 of the Government on management of investment projects for construction of works (EN)
articles 6, 7, 8, 9, 10, 11, 12, 13
3.
Decree 83/2009/ND-CP dated 15/10/2009 of the Government (EN) amending and supplementing a number of Articles of Decree 12/2009/ND-CP of February 12, 2009, on management of work construction investment projects
Article 1.2
4.
Decree No. 164/2013/ND-CP (Expired) of the Government dated November 12, 2013 amending and supplementing a number of Articles of the Government’s Decree No. 29/2008/ND-CP dated March 14, 2008, providing for industrial parks, export processing zones and economic zones
Article 1.21
5.
Decree 29/2008/ND-CP of the Government dated March 14th 2008 on Industrial, Processing and Economic Zones
Article 37.2.d
6.
Circular 03/2009/TT- BXD (Expired ref the expiration of Decision 12/2009/ND-CP ) dated 26/03/2009 of The Ministry of Construction detailing a number of provisions of the government's decree no. 12/2009/nd-cp of february 12, 2009, on management of investment projects on the construction of works
Article 2
7.
Circular No. 19/2009/TT- BXD of the Ministry of Construction dated June 30, 2009 stipulating the state management of investment and construction in industrial parks and economic zones
Article 2
8.
Circular No. 10/2013/TT-BXD of the Ministry of Construction dated July 25, 2013 on construction quality management
articles 14.3, 14.4